Installation day is most successful when scope and alignment are finalized before the first mount point. Professional teams focus on preserving roofline geometry while achieving consistent module spacing.
Typical installation flow
- Home and roofline evaluation
- Track and module placement
- Wiring and controller connection
- Scene calibration and handoff
Homeowner handoff
After commissioning, the system is configured with baseline scenes and schedules. Homeowners can then personalize presets without affecting core installation quality.
A clean install should feel native to the house in daylight and controlled at night.

